22. Engadine OCC, NSW

Quick Win project No. 22: Engadine OCC, NSW

Engadine Flexicare & Education Centre is based in Calderra Avenue, Engadine, near Engadine Library. It is a Not-for-Profit and funded by fees paid by families that use the Centre. Sutherland Shire Council own the building and provide the building for use by the community based Flexicare and education center operations.
Website: http://www.shirechildcare.com.au/engadine_occasional_child_care_inc

See what has been achieved via the CORENA loan to the Engadine Occasional Child Care Centre so far

As of 09/11/18, the loan to Engadine OCC has achieved:

Project 22 kW (solar &/or
EE equivalent)
MWh to date
generated/avoided
Approx* CO2
avoided to date
Dollar value
of achievement
At Engadine OCC 5.00 kW 0.36 MWh 0.36 t $5,817
At subsequent projects 0.31 kW 0.09 MWh 0.09 t $370
Total 5.31 kW 0.45 MWh 0.45 t $6,187

Switch on date: 22/10/18.
Number of days in operation: 18.

* Since the amount of CO2 avoided is highly dependent on the fuel source used for local grid electricity, and since each CORENA project is in a different location, we have used 1MWh = 1 tonne as a rough approximation across all projects.

This project is now fully funded – Thank you!

Sunny Shire assisted with the fundraising for this project and managed to raise $1,165 (20% of the total) from their local supporters. Thank you Sunny Shire!

People contributing to Project 22

Loan amount: $5,817
Loan repayments: $370/quarter
Status: Funded project
Installation date: 23/8/18
System switch-on date: 22/10/18

Work details CostExpected savings
Totals:$5,817Around $1,526/year
6,456kWh/year
5kW Solar
17 x 295w Trina panels
Solar Edge 5kW inverter
17 x Solar Edge optimisers
$5,817Around $1,526/year
6,456kWh/year