7. Warradale Community Child Care, SA

Quick Win project No. 7: Warradale Community Child Care Centre

Warradale Community Children’s Centre opened in 1993 and programs include Child Care for babies and children up to school age and DECD funded Pre-school for 4 year olds. The curriculum is a play based one which incorporates music sessions, a nutrition program, permaculture and sustainability programs. WCCC believes that high quality care and education of young children is a direct result of children, parents, educators and community organisations working together to establish and maintain an environment that is motivating, enriching and challenging for each child. WCCC recently was assessed as “Exceeding National Quality Standards”.
Contact: wcccc@senet.com.au

See what has been achieved so far via the CORENA loan for the Warradale CCC solar PV and LED lighting project

As of 21/09/17, the loan to Warradale CCC has achieved:

Project 7 kW (solar &/or
EE equivalent)
MWh to date
generated/avoided
Approx* CO2
avoided to date
Dollar value
of achievement
At Warradale CCC 6.59 kW 21.97 MWh 21.97 t $14,986
At subsequent projects 2.95 kW 37.83 MWh 37.83 t $56,037
Total 9.54 kW 59.80 MWh 59.80 t $71,023

Install date: 07/12/15.
Number of days in operation: 654.

* Since the amount of CO2 avoided is highly dependent on the fuel source used for local grid electricity, and since each CORENA project is in a different location, we have used 1MWh = 1 tonne as a rough approximation across all projects.
Note: The install date shown above is adjusted to take into account the difference between the install dates of the two parts of this project. The LED lighting was actually installed on 12/10/15, and the solar panels on 11/01/16. You can see the solar output component of this project online at https://monitoringpublic.solaredge.com/solaredge-web/p/kiosk?guid=9575422c-971c-426c-8601-971f3a7026e7

This project is now fully funded – Thank You!

Note: Fundraising for the Warradale CCC project was temporarily on hold while we assessed the impact of a new SA network regulation affecting small business accounts with 3-phase electricity supply when they install solar PV. This tariff change made the payback time 5 years instead of 3.8 years, but that is still a good payback time so we took this project off hold and it has now been fully funded.

People contributing to Project 7

DateNameStateAmount
2015-12-22Stephen RothwellACT$165.55
2015-12-21Laquorious DeeSA$10/week
2015-12-21David CastlefordSA$8/week
2015-12-21David LloydSA$25/month
2015-12-21Ben EllistonACT$100.00
2015-12-18Jean-Pierre Redestroff$19.18/month
2015-12-17Wayne StanfordSA$25/fortnight
2015-12-17Adam HuttyVic$50.00
2015-12-16Peter WadeQld$11/week
2015-12-16HoadieVic$25/week
2015-12-16Marty BoothNSW$60/month
2015-12-16Jonathan MaddoxNSW$50/month
2015-12-15Gabriel NoronhaNSW$10/month
2015-12-15Merry Xmas for Emma BrownVic$100.00
2015-12-14Laquorious DeeSA$10/week
2015-12-14David CastlefordSA$8/week
2015-12-14PaulieSA$20/month
2015-12-14Jonathan PrendergastNSW$5/month
2015-12-14Wayne Stanford xmas giftsSA$60.00
2015-12-11Char GraingerVic$20/month
2015-12-11Tim PriceTas$500.00
(1 panel)
2015-12-10Nick CumboVic$9.86
2015-12-10Robert ANSW$10.00
2015-12-09Peter WadeQld$11/week
2015-12-09HoadieVic$25/week
2015-12-09Wendy HQld$100.00
2015-12-09SWNSW$25/month
2015-12-08Fraser AACT$100.00
2015-12-08Lois GoldsmithNSW$100.00
2015-12-08Last of matching money: L Goldsmith$17.65
2015-12-07Laquorious DeeSA$10/week
2015-12-07David CastlefordSA$8/week
2015-12-07Matching: D Castleford$8.00
2015-12-04Jacinta GreenNSW$5/month
2015-12-04StuVic$50.00
2015-12-04Sean ThompsonNSW$9.44
2015-12-04Matching: S Thompson$9.44
2015-12-03Wayne StanfordSA$25/fortnight
2015-12-02Peter WadeQld$11/week
2015-12-02HoadieVic$25/week
2015-12-02wwQld$50.00
2015-12-02Tim HartleyVic$50.00
2015-12-013rd loan repayment from Beechworth (Project 3)$770.00
2015-12-011st loan repayment from Ravenshoe (Project 6)$855.00
2015-12-01C. EllistonACT$5.00
2015-12-01Matching: C. Elliston$5.00
2015-11-30Laquorious DeeSA$10/week
2015-11-30David CastlefordSA$8/week
2015-11-30Matching: D Castleford$8.00
2015-11-30Interest$0.99
2015-11-30Nick CumboVic$3.01
2015-11-30Sandy PSA$75.00
2015-11-30Matching: Sandy P$75.00
2015-11-29Adelaide climate marchSA$63.95
2015-11-29Matching: Adel march$63.95
2015-11-29James BerkenfeldSA$28.92
2015-11-29Matching: J Berkenfeld$28.92
2015-11-28John RollsSA$45/month
2015-11-26Anton MaurusVic$35/month
2015-11-26Hugh MallenVic$180.00
2015-11-26Nick CumboVic$11.82
2015-11-25Peter WadeQld$11/week
2015-11-25HoadieVic$25/week
2015-11-23Laquorious DeeSA$10/week
2015-11-23David CastlefordSA$8/week
2015-11-23Matching: D Castleford$8.00
2015-11-238th loan repayment from Tulgeen (Project 1)$1,000.00
2015-11-23Ben EllistonACT$50.00
2015-11-20David LloydSA$25/month
2015-11-20Robert ANSW$10.00
2015-11-19Wayne StanfordSA$25/fortnight
2015-11-19PaulNSW$100.00
2015-11-19Matching: Paul$100.00
2015-11-18Jean-Pierre Redestroff$19.18/month
2015-11-18Peter WadeQld$11/week
2015-11-18HoadieVic$25/week
2015-11-17MichaelNSW$50.00
2015-11-16Jonathan PrendergastNSW$5/month
2015-11-16Peter CACT$10.00
2015-11-16Matching: Peter C$10.00
2015-11-16Marty BoothNSW$60/month
2015-11-16Greg Walpole$20.00
2015-11-16Matching: G Walpole$20.00
2015-11-16Bill GreshamACT$20.00
2015-11-16Anon$10.00
2015-11-16Matching: Anon$10.00
2015-11-16Laquorious DeeSA$10/week
2015-11-16Jonathan MaddoxNSW$50/month
2015-11-16David CastlefordSA$8/week
2015-11-16Matching: D Castleford$8.00
2015-11-14Excess from Project 9$0.05
2015-10-12Matching (for David C)$8.00
2015-10-12David CastlefordSA$8/week
2015-10-12PaulieSA$20/month
2015-10-12Char GraingerVic$20/month
2015-10-12Wendy HQld$100.00
2015-10-12Laquorius DeeSA$10/week
2015-10-10Colin George$28.92
2015-10-10Matching (Colin G)28.92
2015-10-10James Saunders$24.05
2015-10-09Janet RiceVic$1,000.00
2015-10-09Greens MPs (compensating for air travel)$1,760.00
2015-10-09SWNSW$25/month
2015-10-08Wayne StanfordSA$25/fortnight
2015-10-07Peter WadeQld$11/week
2015-10-07Matching (for David C)$10.00
2015-10-07HoadieVic$25/week
2015-10-07David CastlefordSA$10.00
2015-10-06Trish KellyQld$200.00
2015-10-05RossCWA$50.00
2015-10-05Matching (for RossC)$50.00
2015-10-05Laquorius DeeSA$10/week
2015-10-05Jacinta GreenNSW$5/month
2015-10-011st loan repayment from Nannup CRC$1,040.00
2015-09-30Peter WadeQld$11/week
2015-09-30Nick CumboVic$10.85
2015-09-30Interest$0.06
2015-09-30HoadieVic$25/week
2015-09-29Warradale CCC donaiton jarSA$12.90
2015-09-28wwQld$50.00
2015-09-28Laquorius DeeSA$10/week
2015-09-28John RollsSA$45/month
2015-09-28Anton MaurusVic$35/month
2015-09-24Wayne StanfordSA$25/fortnight
2015-09-24Monica OliphantSA$75.00
2015-09-24Jill CNSW$100.00
2015-09-23Peter WadeQld$11/week
2015-09-23Mackenzie Davey$10/month
2015-09-23HoadieVic$25/week
2015-09-21Laquorius DeeSA$10/week
2015-09-21David LloydSA$25/month
2015-09-21BenVic$28.00
2015-09-19Dave ClarkeSA$210.00
2015-09-18Jean Pierre Redestorff$19.18/month
2015-09-17Nick CumboVic$9.23
2015-09-16Peter WadeQld$11/week
2015-09-16Jonathan MaddoxNSW$50/month
2015-09-16HoadieVic$25/week
2015-09-15T DahmsSA$100.00
2015-09-15Marty BoothNSW$60/month
2015-09-15Gabriel NoronhaNSW$10/month
2015-09-14Sam FrostSA$50.00
2015-09-14PaulieSA$20/month
2015-09-14NBVic$100.00
2015-09-14Laquorius DeeSA$10/week
2015-09-14Jonathan PrendergastNSW$5/month
2015-09-14Ben EllistonACT$100.00
2015-09-11Char GraingerVic$20/month
2015-09-10Wayne StanfordSA$25/fortnight
2015-09-09SWNSW$25/month
2015-09-09Peter WadeQld$11/week
2015-09-09HoadieVic$25/week
2015-09-07Laquorius DeeSA$10/week
2015-09-04Jacinta GreenNSW$5/month
2015-09-03Nick CumboVic$12.70
2015-09-03Beechworth 2nd loan repayment (Project 3)$770.00
2015-09-02Peter WadeQld$11/week
2015-09-02HoadieVic$25/week
2015-08-31Laquorius DeeSA$10/week
2015-08-31Interest$0.12
2015-08-28John RollsSA$45/month
2015-08-26Wayne StanfordSA$25/fortnight
2015-08-26Peter WadeQld$11/week
2015-08-26HoadieVic$25/week
2015-08-26Anton MaurusVic$35/month
2015-08-24MichaelNSW$100.00
2015-08-24Mackenzie Davey$10/month
2015-08-24Laquorius DeeSA$10/week
2015-08-20Nick CumboVic$10.82
2015-08-20David LloydSA$25/month
2015-08-207th loan repayment from Project 1 (Tulgeen)$1,000.00
2015-08-19wwQld$50.00
2015-08-19Peter WadeQld$11/week
2015-08-19HoadieVic$25/week
2015-08-18Jean Pierre Redestorff$19.18/month
2015-08-17Marty BoothNSW$60/month
2015-08-17Laquorius DeeSA$10/week
2015-08-17Jonathan MaddoxNSW$50/month
2015-08-14StuVic$75.00
2015-08-14Jonathan PrendergastNSW$5/month
2015-08-14Gabriel NoronhaNSW$10/month
2015-08-13Wayne StanfordSA$25/fortnight
2015-08-13Mike CraddockNSW$145.00
2015-08-13Hugh MallenVic$50.00
2015-08-12$515.16 of Loan repayment from Gawler CC$515.16
Olimometer 2.52

Loan amount: $14,986
Loan repayments: $761/quarter
Status: Funded project.
Loan repayments received so far:
1. 18/01/16, $238 (LED loan)
2. 22/04/16, $761
3. 08/07/16, $761
4. 08/11/16, $761
5. 06/01/17, $761
6. 07/04/17, $761
7. 05/07/17, $761

Work details CostExpected savings
Totals:$14,986$3,044/year
12,260kWh/year
5kW solar installation:
- 22 x Jinko JKMS260P (5.72kW peak) Solar High
performance panels and SolarEdge Optimizers
- 1x SE5K-Euro 3ph SolarEdge string inverter
$10,090$1,958/year
7,263kWh/year
3-phase input-output meter$615
Timer for hot water heater$440
Replacement of 61 x 36W fluorescent lamps to
18W VIBE LED lamps
$3,841$1,086/year
4,997kWh/year